Ring/Piston Groove Clearance - Rotax 2005 717 RFI Engine Shop Manual

Engines
Table of Contents

Advertisement

Section 01 ENGINE MEASUREMENT
Subsection 01 (MEASUREMENT PROCEDURES)
1. Micrometer set to the piston dimension
Proceed with FINAL MEASUREMENT PROCE-
DURE WITH EITHER A USED OR NEW PISTON
below.
Final Measurement Procedure with
either a Used or New Piston
With the micrometer set to the piston dimension,
adjust a cylinder bore gauge to the micrometer
dimension and set the indicator to zero.
1. Use the micrometer to set the cylinder bore gauge
2. Dial bore gauge
4
1. Indicator set to zero
Position the dial bore gauge at 16 mm (5/8 in) be-
low cylinder top edge.
A
F01D0KA
1. Measuring perpendicularly (90°) to piston pin axis
A. 16 mm (5/8 in)
Read the measurement on the cylinder bore
gauge. The result is the exact piston/cylinder wall
clearance.
NOTE: Make sure the cylinder bore gauge indica-
tor is set exactly at the same position as with the
micrometer, otherwise the reading will be false.
RING/PISTON GROOVE
CLEARANCE
Using a feeler gauge, check clearance between
rectangular ring and groove. If clearance exceeds
specified tolerance, replace piston.
www.SeaDooManuals.net
1
smr2005-085

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Rotax 2005 717 RFI

This manual is also suitable for:

2005 787 rfi

Table of Contents