Service And Maintenance - Ferroli ECONCEPT 51 Instructions For Use, Installation And Maintenance

Table of Contents

Advertisement

Available languages

Available languages

D
Make sure to correctly fit the seals.
E
Lengthen the diameter 100mm extensible part of each valve until it rests
on the inner part of the casing. Fix with the screw "4".
F
Pour 1/2 litre of water on each flue in order to fill the respective traps and
anti-backflow valves. Repeat the above steps for all the flue connections
of the modules.
G
Fit the manifold support flanges "5" using the special holes provided on
the top of the modules. The starting bracket on the first module must re-
spect the distance of 45 mm. (see box "G" fig. 35). This distance must be
increased by 5 at a time in the following modules, in order to obtain the
fume manifold angle as indicated in fig. 32. Fit the condensate trap "6"
support bracket on the flange of the first module.
H
Insert the 90° M-F bends "8" on the pipe sections "7", positioning them at
45° with respect to the module (see box "H" fig. 35). When installing a
module ECONCEPT 51/51i use only one 90° bend and the cap contained
in the starting kit.
L
Fit the flue pipes together (operation to be carried out on the ground) , en-
suring the alignment of the various connections "9" and respecting the
coupling measurement of 705 mm (see box "L" fig. 36).
M
Place the manifolds connected together on the support flanges and grad-
ually insert all the bends on the previously fitted diameter 100 pipe sec-
tions.
Check the correct angle of the manifold (see fig. 32) and the correct fitting
of all the pipe sections, bends and valves, making sure the seals are prop-
erly fitted (see box "M" fig. 36). Make the external seals adhere to the top
of the modules. Tighten and fix the support flanges.
N
Fit the manifold closing cap "10". Insert the condensate trap "11" and fix
it to the special bracket "6" fitted in point "G". Connect the trap outlet to a
condensate collection point (e.g. the condensate manifold of the modules).
A
Use a special lubricant to facilitate the manifold connections.
48
EN
ECONCEPT 51/51i - 101/101i
fig. 34
fig. 35
fig. 36
cod. 3540S571 - 09/2009 (Rev. 00)
3.6 Condensate drain
B
The boiler has an internal condensate drain trap connected to an internal con-
densate outlet manifold.
Condensate drain connection using one generator
fig. 37 - Condensate drain connection with one generator
A
Place the Ø40 pipe 1 (not supplied) on the side of the generator.
B
Slide the pipe 2 towards the side of the arrow for at least 2-3 cm in order to in-
sert it in the pipe 1.
Condensate drain connection using two or more generators
2
fig. 38 - Condensate drain connection with several generators
A
Place the Ø40 pipe 1 (not supplied) on the side of the generator
B
Slide the pipe 2 (of each generator) towards the side of the arrow for at least 2-
3 cm in order to insert it in the pipe 1.

4. SERVICE AND MAINTENANCE

All adjustment, conversion, commissioning and maintenance operations described be-
low must only be carried out by Qualified Personnel (meeting the professional technical
requirements prescribed by current regulations) such as those of the Local After-Sales
Technical Service.
FERROLI declines any liability for damage and/or injury caused by unqualified and un-
authorised persons tampering with the unit.
4.1 Adjustments
Gas conversion
The unit can operate on natural gas or LPG and is factory-set for use with one of these
two gases, as clearly shown on the packing and on the dataplate. Whenever a gas dif-
ferent from that for which the unit is arranged has to be used, a conversion kit will be re-
quired, proceeding as follows:
1.
Open the cabinet of the upper exchange body using the special key supplied.
2.
Loosen the gas valve fixing ring "A" .
3.
Undo the three fixing screws "B" and remove the gas valve "C".
4.
Replace the gas valve "D" with the one contained in the conversion kit, positioning
it inside the seal "E" . Refit the parts and check their tightness.
5.
Repeat steps 2, 3 and 4 for the lower exchanger body (model ECONCEPT 101/
101ionly)
6.
Modify the parameter on control system.
put the boiler in standby mode
press the DHW buttons (details 1 and 2 - fig. 1) for 10 seconds: the display
shows "P01" flashing.
press the DHW buttons fig. 1 (details 1 and 2 - ) to set parameter 00 (for use
with natural gas) or 01 (for use with LPG ).
press the DHW buttons (details 1 and 2 - fig. 1) for 10 seconds.
the boiler will return to standby mode
7.
Apply the label, contained in the conversion kit, near the dataplate.
1
A
2
2
B
1
A
B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Econcept 51iEconcept 101Econcept 101i

Table of Contents