Download Print this page

Name Of Each Part - Hitachi CSC-5S Installation And Operation Manual

Advertisement

5.

NAME OF EACH PART

Liquid Crystal Display Section
The figure below shows all the indications for reference.The actual display during operation is
different.
Indication of
Operating Unit
(Page 10)
Indication of Each
Unit Operation
(Page 12)
Indication of
Operation Mode
(Page 12)
RUN Lamp
(Red)
(Page 10, 15)
RUN/STOP
Switch
(Page 15)
Operation Mode
Change Switch
(Page 12)
Air Conditioning /
Heat Storage
Switch
(Page 12)
Timer Selection
Switch
(Page 16)
Option Selection
Switch
(Page 18, 19)
Group Setting
Switch
(Page 8)
NAME OF EACH PART
Indication of Individual Control
(indicated during individual
control) (Page 8)
Indication of Multiple Units
Control
(indicated during multiple units
control) (Page 8)
COOL
UNIT No.
TIMER
MULTI
INDVDL
EMG.STOP
HEAT
NO FUNC.
DEMAND
H.RCV.
1
2
3
4
5
6
7
8
A/C
H.STRG
RUN/STOP
MODE CHANGE
A/C/H.STRG
DISP.MODE
TIMER
OPTION
GROUP
Display
Temperature Setting
Changeover Switch
Switch
(Page 14)
(Page 13)
Timer
Indication of
Indication
Emergency Stop
(Page 16)
(Page 17)
Demand
Indication of "No
Indication
Function"
(Page 17)
(indicated in case of
incorrect operation)
INLET
SET TEMP.
MPa
OUTLET
TEMP. PR.
LOCAL
ABNML
CHECK
UNIT SELECTION
RESET
CHECK
TEMP.
Check Switch
(Page 13, 20)
This switch is used
only for servicing.
Do not touch this
switch except for
servicing.
7
Indication of
Setting
Temperature
(Page 10, 13)
Indication of
Inlet / Outlet
Temperature
(Page 13)
Alarm
Indication
(Page 17)
Local
Indication
(Page 17)
Unit
Selection
Switch
(Each Page)
Reset
Switch
(Page 8, 18)

Advertisement

loading