1. System installation........................................................................................ I-4
1-1-1.
1-1-2.
1-2-1.
1-2-2.
1-2-3.
1-2-4.
2-2-1.
2-2-2.
Remote printer failure ..................................................................................... I-13
2-3.Recovery processing ................................................................................................ I-14
2-3-1.
2-3-2.
2-6.LAN printer down ....................................................................................................... I-15
To prevent malfunctions caused by the weak batteries, charge the memory
protection batteries for over 12-hours before installation or after a longtime vacation
(over 30 days).
• Before installation, initialize the terminal and leave it power on over 12-hours.
• After a longtime vacation, initialize the terminal and restore the program data if the
terminal is in malfunction, and leave it power on over 12-hours.
• QT-6600 consumes batteries for saving data during 2 minutes after turning off the
terminal.
• Do NOT power off the terminal over 10 times while a short term. (Except INIT or FC
operation) Otherwise, it makes weak batteries.
QT-6600 Installation & Down Recovery Manual
I-3