Mitsubishi Electric PCH-2GKHA Service Manual page 61

Hide thumbs Also See for PCH-2GKHA:
Table of Contents

Advertisement

OPERATING PROCEDURE
12. Removing the support heater.
(1) Remove the air intake grill.
(2) Remove the beam.
(3) Remove the side panel (right and left).
(4) Remove the relay connector for the pipe thermistor.
(5) Remove the under panel.
(6) Remove the drain pan.
(7) Remove the screw from the pipe cover, and remove the
pipe cover.
(8) Remove the screw from the pipe support, and remove the
pipe fixed support.
13. Removing the heat exchanger.
(1) Remove the air intake grill.
(2) Remove the beam.
(3) Remove the side panel (right and left).
(4) Disconnect the relay connector.
(5) Remove the under panel.
(6) Remove the drain pan.
(7) Unscrew the screw of the pipe cover, and remove the
pipe cover.
(8) Unscrew the screw of the pipe support, and remove the
pipe support.
(9) Unscrew the screw of the heat exchanger, and remove
the heat exchanger.
Remove the heat exchanger with care. Since this is quite
heavy, removing work should be done with more than 2
people.
wWeight of heat exchanger : App. 5.3kg
PHOTOS
Photo 11
Screws
Clamp
Connector
(heater)
Photo 12
Pipe
support
Screws
Screws
Pipe cover
Service
panel
Electrical
box
Heat
exchanger
61

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents