Download Print this page

Lance-Larkin BrewExpress Brew Express CoffeeMaker Cleaning Instructions Manual

Flow control cleaning / replacement procedure

Advertisement

Quick Links

Flow Control CLEANING / REPLACEMENT Procedure
Step #1
Please remove the Brew Express from the wall by removal of 4 outside set screws, and
pull away by holding the sides of the unit. Upon removal, press a grey button on the
water line (quick-connection) to disconnect the water line.
45B7DF64-103B-08A7B4.doc

Advertisement

loading
Need help?

Need help?

Do you have a question about the BrewExpress Brew Express CoffeeMaker and is the answer not in the manual?

Questions and answers

Summary of Contents for Lance-Larkin BrewExpress Brew Express CoffeeMaker

  • Page 1 Flow Control CLEANING / REPLACEMENT Procedure Step #1 Please remove the Brew Express from the wall by removal of 4 outside set screws, and pull away by holding the sides of the unit. Upon removal, press a grey button on the water line (quick-connection) to disconnect the water line.
  • Page 2 Step #2 Place Brew Express face down on a towel to protect front face 45B7DF64-103B-08A7B4.doc...
  • Page 3 Loosen lower valve connection nut with 18 mm or equivalent wrench. Step 4 Carefully pull away slightly and Rotate water line using pliers. Caution: Gasket O-ring seal may fall into unit. Remove / watch so it does not fall off. Caution: Do Not Bend copper line! JUST ROTATE! 45B7DF64-103B-08A7B4.doc...
  • Page 4 Step 5 Remove flow control with 18 mm or equivalent wrench 45B7DF64-103B-08A7B4.doc...
  • Page 5 Step 6 To Clean for low volume (Flow) Problem : Rinse under strong stream of water to clean or and use small paper clip / wire to push through center hole to clear. Dry with towel. (For Replacement of Flow Control, Go to #7) 45B7DF64-103B-08A7B4.doc...
  • Page 6 Step 7 Place Cleaned or Replacement flow control back into valve. Seal O-Ring on flow control should be upward direction only. 45B7DF64-103B-08A7B4.doc...
  • Page 7 Tighten with wrench snug to valve. Step 8 Re-Align copper line with flow control by rotating. Ensure small o-ring did not fall off. Tighten nut snug to secure copper line to flow control. Do not over-tighten nut O-ring 45B7DF64-103B-08A7B4.doc...
  • Page 8 Tighten copper line connection. Do not over tighten. Step 9 Re-Install Brew Express into wall, “Snap” together water connection re-set clock, remove and clean spray-head (recommended), and run two pots of water without spray-head to clear any debris that maybe in the system. Re-install spray-head. Complete!!!! Cleaning or Replacement of flow control should only take about 10 minutes to perform.
  • Page 9 45B7DF64-103B-08A7B4.doc...

This manual is also suitable for:

Brew express