Read carefully the below instructions prior to the installation of the heater! Dear Customer, The Works Cooperative of Dražice – Machine Plant, Ltd., would like to thank you for your decision to use a product of our brand. The manufacturer reserves the right for engineering modification of the product. The product is designed for permanent contact with drinkable water.
for mounting an additional heating element. Such version is used when the heater is connected to either a solar system or a system with a heat pump, to heat water in the upper part of the heater to the temperature required. The insulation of the heater consists of a 100 mm polyurethane foam without CFCs content.
CONNECTING A HEATER TO A HOT WATER DISTRIBUTION Implement the connection in accordance with scheme on page 6. Scheme of Heater's Water Inputs and Outputs OKC 800 NTR/1 MPa OKC 800 NTRR/1 MPa OKC 1500 NTR/1 MPa OKC 1500 NTRR/1 MPa OKC 2000 NTR/1 MPa OKC 2000 NTRR/1 MPa The heater’s cold water inlet must be fitted with a T-fitting with a discharge valve for any discharge of water from the...
SPARE PARTS - Mg anode – 800 l; - Thermometer; When ordering spare parts, give part name, type, and type number from the heater label. HEATER CLEANING AND ANODE ROD EXCHANGE Repetitive water heating causes limestone sediment on both the enamelled tank walls and chiefly the flange lid. The sedimentation depends on the hardness of water heated, its temperature, and amount of hot water consumed.
Page 7
OKC 800-2000 NTR OKC 800-2000 NTRR heated by a gas boiler with two pumps heated by a gas boiler and solar collectors controlled by a three-way valve An example of a group heater connection for steady hot water consumption from all tanks using Tichelmann’s method OV –...
PERFORMANCE DATA Exchanger performance the for flow of 500 l/hr 1,000 l/hr 3,000 l/hr 4,500 l/hr 800 NTR/NTRR – bottom exchanger surface 2.76 m Heating time by exchanger for temperature drop 80/60°C (min) Performance for temperature drop 80/60°C (kW) 20,2 29,9 41,8 Permanent performance (l/hr)
PRESSURE LOSSES Disposal of packaging material and functionless product A service fee for providing return and recovery of packaging material has been paid for the packaging in which the water heater was delivered. The service fee was paid pursuant to Act No. 477/2001 Coll., as amended, at EKO-KOM a.s.
ASSEMBLY GUIDE FOR ZIP-FASTENER INSULATION (Only concerns heaters with the capacity of 800 and 2000 litres) Two people are enough to implement the assembly; three people are required for larger boilers; the assembly must be implemented in areas with the temperature of at least 18 If the insulation includes tank bottom insulation, the latter must be mounted first.