Download Print this page

Mosaic FSMVPT6004 Assembly Instructions And User's Manual page 7

40in metallic fire bowl

Advertisement

Assembly Instructions
Step 3:
Insert the frame (G) to the base ring (H), as seen in
FIG 3. Connect the other end of the frame to the top
ring (E) using M6 x 8mm bolts (BB). Repeat this
step for the rest of the frames.
Step 4:
Place the fire bowl (D), log grate(C) and mesh screen
(B) into the assembly base. Place the poker (I) near
the fire pit. Ensure all parts are secure. The fire bowl
is ready for use.
6
G
FIG 3
E
H
BB
B
C
D
I

Advertisement

loading