Gas Conversion Procedure - Rinnai INFINITYREU-V3232W Service Manual

High capacity continuous flow gas hot water system
Table of Contents

Advertisement

19. Gas Conversion Procedure

1)
Close the main gas valve.
Turn power OFF (disconnect the power cord).
2)
Remove front cover. (4 screws)
3)
Remove manifold (complete assembly). (7 screws)
4)
Replace the manifold (complete assembly) and the
packing. (7 screws)
Note: Do not loose or damage the O-ring when
reassembling.
Ensure connections for the solenoid and sparker lead
are made properly.
Infinity REU-V3232W /HD250E REU-V3232WC
- 41 -
Issue 1 - 8/09/03 ©Rinnai

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hd250e reu-v3232wc

Table of Contents