Important Safety Information - 3Com SuperStack 3 Switch 4300 Getting Started Manual

3com superstack 3 switch 4300 getting started guide
Hide thumbs Also See for SuperStack 3 Switch 4300:
Table of Contents

Advertisement

34
A
A: S
PPENDIX
AFETY
Important Safety
Information
I
NFORMATION
Installation and removal of the unit must be carried out by qualified
personnel only.
If installing the Switch 4300 in a stack with SuperStack II or
SuperStack 3 units that are narrower than the 4300, the Switch 4300
unit must be installed below the narrower units.
The unit must be earthed (grounded).
Connect the unit to an earthed power supply to ensure compliance
with safety standards.
Power Cord Set:
This must be approved for the country where it is used:
U.S.A. and
Canada
United
Kingdom only
Europe only:
Denmark
Switzerland
The appliance coupler (the connector to the unit and not the wall
plug) must have a configuration for mating with an EN60320/IEC320
appliance inlet.
The socket outlet must be near to the unit and easily accessible. You
can only remove power from the unit by disconnecting the power
cord from the outlet.
The cord set must be UL-approved and CSA certified.
The minimum specification for the flexible cord is:
No. 18 AWG
Type SV or SJ
3-conductor
The cord set must have a rated current capacity of at least
10A.
The attachment plug must be an earth-grounding type
with a NEMA 5-15P (15A, 125V) or NEMA 6-15P (15A,
250V) configuration.
The supply plug must comply with BS1363 (3-pin 13 amp)
and be fitted with a 5A fuse which complies with BS1362.
The mains cord must be <HAR> or <BASEC> marked and
be of type H03VVF3GO.75 (minimum).
The supply plug must comply with CEE 7/7 ("SCHUKO").
The mains cord must be <HAR> or <BASEC> marked and
be of type H03VVF3GO.75 (minimum).
The supply plug must comply with section 107-2-D1,
standard DK2-1a or DK2-5a.
The supply plug must comply with SEV/ASE 1011.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents