Download Print this page

Wisniowski MakroPro 100 Operating And Installation Instructions page 25

Hide thumbs Also See for MakroPro 100:

Advertisement

Operating and Installation Instructions - MakroPro 100, MakroPro Alu 100 - installation type STL HL
Indicator connection diagram
56
Indicator
Connection of the indicators to servomotor GfA with control
TS 96: should be made according to diagram - fig. 56.
Position the additional extremity S6 (yellow) in the same way as
the main opening extremity S3 (green).
57
Operating and Maintenance Manual
Red
Green
MakroPro 100 – installation type HL
With the gate closed and during its movement red light should
be lit. With the gate opened green light should be lit.
P
25

Advertisement

loading

This manual is also suitable for:

Makropro alu 100