How To Remove Water Pump/ Pump Valve; Water Pump; Pump Valve - Mitsubishi Electric EHSD-MEC.UK Service Manual

R410a hydrobox
Hide thumbs Also See for EHSD-MEC.UK:
Table of Contents

Advertisement

DISASSEMBLY PROCEDURE

5. How to remove water pump/ pump valve

E*S* series
<Water pump>
Close the pump valve (OFF) before removing the water pump,
and open the valves (ON) after reinstalling the water pump.
(1) Remove the front panel. (Refer to Procedure 1.)
(2) Disconnect the CNP1 connector, the earth cable, and the
CNPWM connector in the control box. (Photo 5-1)
(3) Release the water pump lead wire from the 5 cable
clamps, the 2 cable straps, the coated clamp and feed
the lead wire out the control box without putting strain on
the CNP1 connector. (Photo 5-1)
(4) Swing the control box to the front. (Refer to Procedure 4.)
(5) Close (OFF) the pump valve and remove the G1" nuts
using two spanners: one to hold the G1" nut and the
other to turn the other side of G1" nut.
Remove the water pump by sliding it horizontally. (Photo
5-2)
• When the pump valve handle is stiff, turn the handle 90
degrees clockwise mainly by using a spanner.
• When reinstalling the G1" nuts, use new G1" gaskets.
(Photo 5-3)
• Set the water pump in the way that the die stamped
arrow facing down, and the terminal box facing to the
left. (Photo 5-2)
• When opening or closing the pump valve, ensure to do
so fully, not halfway.
<Pump valve>
(6) Remove the screws fixing the pump valve stay. (Photo
5-2)
(7) Remove the pump valve by detaching the quick connec-
tion. (Photo 5-2)
• When reinstalling the quick connection, use new O-ring.
• When the pump valve handle is stiff, turn the handle 90
degrees clockwise mainly by using a spanner. (Photo
5-4)
• When reinstalling the pump valve, place the handle to
the left hand side of the pump valve.
• When opening or closing the pump valve, ensure to do
so fully, not halfway.
• Reuse the removed pump valve stay and the pump
valve stay fixing screws. (Photo 5-4)
• Refer to page 77 for how to attach and detach the quick
connection.
Note: Skip Steps (2) and (3) above when replacing the
pump valves only.
Photo 5-3
E*S* series)
(
OCH571
Gasket G1"
61
PHOTOS
Photo 5-1
Cable
clamp
Earth cable
Lead
wire
Cable
clamps
Cable strap
Coated clamp
Photo 5-2
E*S* series)
(
Gasket (G1")
Nut (G1")
Terminal box

Water pump

Nut (G1")
Gasket (G1")

Pump valve

Pump valve
stay
Photo 5-4
E*S* series)
(
Screws
Water pump
connector (CNP1)
CNPWM
connector
Cable
clamps
Cable strap
Flow direction
Screws
O-ring
Quick
connection
Pump valve
stay

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents