10
Initial start-up
10
Initial start-up
10.1
Preparing for operation
Please also note the user manual supplied with the
external time controls and thermostat.
10.1.1 Check water pressure
Check the pressure gauge (fig. 4, item 3) located at the
bottom of the boiler for the current system pressure.
Optimum system pressure is 1.5 bar.
CH flow
fig. 4
Servicing valves
18
3
1
GAS
2
http://www.buderus-domestic.co.uk
CH return