Ent Ntake Erminations Or; Multiple; Condensate Drain Lines & Drain Trap; Side Wall Vent Kit - Amana xMVC96 series Installation Instructions Manual

Two-stage gas furnace
Table of Contents

Advertisement

AIR
INTAKE
SCREEN
(OPTIONAL)
Combustion Air Intake may also be snorkeled to obtain 12" min ground
clearance.
Alternate Vent Termination Above Anticipated Snow Level
V
/I
T
ENT
NTAKE
ERMINATIONS
D
V
F
IRECT
ENT
URNACES
If more than one direct vent furnace is to be installed vertically
through a common roof top, maintain the same minimum clear-
ances between the exhaust vent and air intake terminations of
adjacent units as with the exhaust vent and air intake termina-
tions of a single unit.
If more than one direct vent furnace is to be installed horizon-
tally through a common side wall, maintain the clearances as in
the following figure. Always terminate all exhaust vent outlets at
the same elevation and always terminate all air intakes at the
same elevation.
3" MIN
OPTIONAL
INTAKE
SCREENS
Termination of Multiple Direct Vent Furnaces
90°
ELBOWS
3"-24" BETWEEN PIPES
12" MIN. ABOVE
HIGHEST ANTICIPATED
SNOW LEVEL
(Dual Pipe)
Figure 17
F
I
M
OR
NSTALLATION OF
ULTIPLE
3"MIN
24"MAX
12" MIN SEPARATION
12" MIN TO GRADE OR HIGHEST
ANTICIPATED SNOW LEVEL
Figure 18
C
V
T
ONCENTRIC
ENT
ERMINATION
Refer to the directions provided with the Concentric Vent Kit
(DCVK) for installation specifications.
S
W
V
K
IDE
ALL
ENT
IT
H orizontal Installation
Ve rtica l Installation
This kit is to be used with 2" or 3" direct vent systems. The
vent kit must terminate outside the structure and may be in-
stalled with the intake and exhaust pipes located side-by-side or
with one pipe above the other. These kits are NOT intended for
use with single pipe (indirect vent) installations.
Refer to the directions furnished with the Side Wall Vent Kit
(p/n 0170K00000S or 0170K000001S) for installation speci-
fications.
C
D
ONDENSATE
RAIN
A condensing gas furnace achieves its high level of efficiency by
extracting heat from the products of combustion to the point
where condensation takes place. The condensate must be col-
lected in the furnace drain trap and routed to an appropriate
drain location in compliance with local and national codes.
Follow the bullets listed below when installing the drain system.
Refer to the following sections for specific details concerning
furnace drain trap installation and drain hose hook ups.
The drain trap supplied with the furnace must be
used.
The drain trap must be primed at time of
installation.
The drain line between furnace and drain location
must meet local and nation codes.
The drain line between furnace and drain location
must maintain a 1/4 inch per foot downward slope
toward the drain.
Do not trap the drain line in any other location than at
the drain trap supplied with the furnace.
If the drain line is routed through an area which may
see temperatures near or below freezing, precautions
must be taken to prevent condensate from freezing
within the drain line.
If an air conditioning coil is installed with the furnace,
a common drain may be used. An open tee must be
installed in the drain line, near the cooling coil, to
relieve positive air pressure from the coil's plenum.
This is necessary to prohibit any interference with the
function of the furnace's drain trap.
17

Side Wall Vent Kit

Figure 19
L
& D
T
INES
RAIN
RAP

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xcvc96 series*cvc96*mvc96

Table of Contents