Before You Begin - Kohler Digital Interface K-683 Installation Manual

Kohler digital interface installation guide
Table of Contents

Advertisement

Available languages

Available languages

3-5/8" (9.2 cm)
4-1/2" (11.4 cm)
8-1/2"
(21.6 cm)
3/16" (5 mm) Min –
2" (5.1 cm) Max Depth
Roughing-In

Before You Begin

Observe all local plumbing, building, and electrical codes.
Read these instructions and determine all required components along with their installation
locations before beginning this installation.
A licensed electrician should install a 120 V GFCI electrical outlet, within the stud framing, in close
proximity to the electronic valve. The interface(s) is/are powered through the connection(s) with the
valve.
Install the valve prior to installing the interface(s).
Kohler Co. reserves the right to make revisions in the design of faucets without notice, as specified
in the Price Book.
1043184-2-B
Clamp Arm
3-5/8" (9.2 cm) –
4-5/8" (11.7 cm)
Wall Cavity
Depth
7-5/8"
(19.4 cm)
1/2" (1.3 cm) Min Clamp
Arm Clearance
7-11/16"
(19.5 cm)
3-11/16" (9.4 cm)
Cutout Detail
8-Pin Interface Cable
30' (9.14 m)
4-Pin Auxiliary Interface Cable
30' (9.14 m)
4
Cutout
1/4" (6 mm) Min
Interface Lip
Clearance
Kohler Co.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

K-684K-685K-686K-683686-1cp

Table of Contents