Horizontal Installations - Goodman GMV9 Installation & Operating Instructions Manual

Gas fired warm air furnace single stage
Hide thumbs Also See for GMV9:
Table of Contents

Advertisement

2. Secure drain trap to side panel at the mounting holes (dimples
or crosshairs on counterflow models) located below the
grommet drain holes.
3. Attach PVC drain line to drain trap outlet with either a 90°
elbow or coupling.
H
I
ORIZONTAL
NSTALLATIONS
R
S
D
IGHT
IDE
OWN
Horizontal installations with the right side down require that the drain
hoses be connected to the right side front cover drain port and the
rubber elbow drain port.
NOTE: On counterflow models, relocation of the front cover pressure
switch hose is required.
Make connections as follows:
1. Remove the rubber plug from the coil front cover drain port.
Counterflow furnaces
Relocate the front cover pressure switch hose connection
from the left side pressure tap to the right (down) side tap.
The pressure switch hose must be connected to the down
side to guard against blocked drain conditions. Cut hose to
appropriate length to minimize sagging. Plug left (unused)
pressure tap with plug removed from right side.
2. Secure Hose A to front cover drain tap with a red hose clamp.
Route hose to rear right (down) side panel grommet holes.
3. Cut 1/4 inch from the end of the drain port on the rubber
elbow and discard.
4. Insert Tube 1 into rubber elbow drain port and secure with a
red hose clamp. Angle tube outward toward front of furnace.
5. Cut 17 3/4 inches from the long end of Hose B and discard.
6. Secure remaining end of Hose B to exposed end of Tube 1
with a green hose clamp. Route hose to front right down
side panel grommet holes.
7. Cut 5 1/2 inches straight length from the long end of each
Tube 2.
FRONT COVER
DRAIN PORT
RED HOSE
CLAMP
HOSE A
HOSE B
SIDE PANEL
GROMMET
HOLES
TUBES 2
DRAIN TRAP
Horizontal Connections - Right Side Down
(Upflow Shown, Counterflow Similar)
8. Insert approximately one inch of each Tube 2 through the
right down side panel grommet holes. Secure tubes to Hose
A and Hose B using green hose clamps. Ensure hoses and
tubes maintain a downward slope for proper drainage and
are not kinked or bound.
For details concerning mounting of the drain trap, refer to Section X,
Condensate Drain Lines and Drain Trap - Upright Drain Trap Mount-
ing.
L
S
D
EFT
IDE
OWN
Horizontal installations with the left side panel down will require drain
hoses to be connected to the left side front cover drain port and the
induced draft blower drain port.
IO-243
FRONT
COVER
PRESSURE
RUBBER
TAP
ELBOW
RIGHT
SIDE
PANEL
RUBBER ELBOW
GREEN
DRAIN PORT
HOSE
TUBE 1
RED HOSE
CLAMP
CLAMP
(3 PLACES)
NOTE: Horizontal left side down installations must use Furnace Vent
Drain Kit RF000142 to prevent nuisance tripping of the pressure
switch. Relocation of the front cover pressure switch hose is required.
1. Remove the rubber plug from the coil front cover left (down)
side drain port.
2. Upflow furnaces
Relocate the front cover pressure switch hose connection
from the right side (as shipped) pressure tap to the left (down)
side tap. The pressure switch hose must be connected to
the down side to guard against blocked drain conditions. Cut
hose to appropriate length to minimize sagging. Plug right
(unused) pressure tap with plug removed from left side.
3. Secure Hose A to front cover drain port with a red hose clamp.
Route hose to rear left (down) side panel grommet holes.
NOTE: For left side drainage, grommets must be relocated
to left side panel.
FRONT
COVER
PRESSURE
TAP
LEFT SIDE
FRONT COVER
PANEL
DRAIN PORT
RED HOSE CLAMP
Horizontal Connections - Left Side Down
(Upflow Shown, Counterflow Similar)
4. Cut "X" inches from the long end of Hose B and discard.
Refer to table for appropriate length to cut.
Cabinet Width
Models
(inches)
(kBTU_Tons)
17 1/2
45__30
21
70__40
090__50
24 1/2
115__50
5. Secure short end of Hose B to induced draft blower drain
port using a green hose clamp. Route hose to front left (down)
side panel grommet holes.
6. Cut 5 1/2 inches straight length from the long end of each
Tube 2.
7. Upflow Units with a 17 1/2" cabinet width.
Insert approximately one inch of cut Tube 2 through left side
panel grommet hole and secure to Hose A with a hose clamp.
Insert remaining Tube 2 through other grommet hole and
splice to Hose B with Tube 1, green hose clamps and a short
section of hose as shown below. NOTE: Tube must reach
bottom of trap.
20
INDUCED
DRAFT BLOWER
DRAIN PORT
HOSE B
HOSE A
GREEN HOSE
CLAMPS
(3 PLACES)
TUBE(S) 2
DRAIN TRAP
SIDE PANEL
GROMMET
HOLES
"X" Length to Cut From Long
End of Hose B
18 5/8 inches
14 1/2 inches
11 1/4 inches
6/04

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gcv9

Table of Contents