Specifications; Operation Instructions - APW Wyott AT Express Installation And Operating Instructions Manual

Apw/wyott horizontal conveyor toaster installation and operating instructions
Table of Contents

Advertisement

III.
Toaster Placement
A.
Locate the toaster near a grounded receptacle of the proper configuration (see below). Plug
the cordset directly into receptacle (DO NOT USE AN EXTENSION CORD).
1. In the United States, NEMA 5-15R.
2. In Canada, NEMA 5-20R.
B.
Place the toaster on a flat surface providing the following minimum clearances:
1. Base = one inch (provided with legs installed).
2. Side and back walls = two inch
3. Overhead = Enough space to allow adequate heat displacement.
4. WARNING: Failure to provide these clearances will cause unit failure and invalidate
warranty claims.
C.
Position toaster where customers will not contact any surface labeled "CAUTION HOT".
NOTE: DO NOT OPERATE THE TOASTER WITH THE LEGS REMOVED.
I.
Preparation
A.
Clean toaster thoroughly before first use (See cleaning instructions).
B.
Controls Familiarity
1. Top Heat Switch: Operates top elements and conveyor.
2. Bottom Heat Switch: Operates bottom element and conveyor.
C. Warm-up time: Allow five (5) minutes.
II.
Normal Use
A.
Loading Product
1. Place product on Wire Feeder. The conveyor will automatically draw product through the
toaster at a speed determined by conveyor speed control.
B.
Toasting Darkness: determined by conveyor speed.
1. Darkest toasting - set conveyor speed control to one (1).
2. Lightest toasting - set conveyor speed control to ten (10).

SPECIFICATIONS

15.634
2.356
14.723
13.271
1.000

OPERATION INSTRUCTIONS

40°
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents