Download Print this page

Optional Extras - Miele PT 7251 EL Installations Plan

Advertisement

Technical datasheet
Tumble dryer:
Heating:
Legend:

Optional extras:

BS
Concrete platform
Machine connections:
Electrical
connection
Peak load
management
Installationsplan PT 7251 EL
Stand: 23.09.2004
Circled, bold-type abbreviations:
Connection required
Abbreviations surrounded by broken circle:
Connection optional or required, depending on model
Concrete plinth (to be provided on-site) optional.
Min. concrete quality B15
Recommended height
Minimum height
Recommended width
Recommended depth
Ensure good anchorage!
1. Standard voltage (as supplied)
Frequency
Rated load
Fuse rating
Supply lead (H 07 RN-F), min. cross-section
with threaded cable connector
2. Standard voltage (as supplied)
Frequency
Rated load
Fuse rating
Supply lead (H 07 RN-F), min. cross-section
with threaded cable connector
3. Standard voltage (as supplied)
Frequency
Rated load
Fuse rating
Supply lead (H 07 RN-F), min. cross-section
with threaded cable connector
Connection using multi-pole wall socket in compliance with
IEC 60309 and IEC 60947 is recommended in order to
simplify electrical tests.
If using a hard-wired connection, install mains isolator
according to IEC 60947.
Wall socket or mains isolator must be accessible after
installation.
The use of an earth leakage circuit breaker (ELCB) is strongly
recommended.
If necessary, equipotential bonding with good galvanic contact
must be provided in accordance with all appropriate national
and local regulations.
Connection cable, min. cross-section
Input leads should not be in direct contact with any source of
heat.
Signal supplied via potential-free (galvanically separated)
contact.
PT 7251
Electric (EL)
G
mm
50
mm
50
mm
900
mm
850
V
3N AC 380-415
Hz
50 (60)
kW
14.2
A
3 × 25
mm²
5 × 4
M 32
V
3 AC 220-240
Hz
50 (60)
kW
14.2
A
3 × 50
mm²
4 × 10
M 40
V
3 AC 440
Hz
50 (60)
kW
14.2
A
3 × 25
mm²
4 × 4
M 32
mm²
3 × 1.5
Seite 7

Advertisement

loading