Slide 8
The installation package
contains the fill hoses, a
combination wrench for
removing the shipping
bolts and adjusting the
leveling legs, filler plugs
and a drain hose bracket.
Slide 9
Remove the four 10mm
shipping bolts and spacers
Slide 10
Save the shipping bolts and spacers and
installation instruction in case of a future move.
4