Carrier 40GRQ Owner's Manual page 30

High-wall ductless split system sizes 09 to 18
Hide thumbs Also See for 40GRQ:
Table of Contents

Advertisement

INDOOR UNIT INSTALLATION
Step eight: bind up pipe
1. Bind up the connection pipe, power
cord and drain hose with the band.
indoor unit
gas
pipe
2. Reserve a certain length of drain
hose and power cord for installation
when binding them. When binding to
a certain degree, separate the indoor
power and then separate the drain
hose.
Step nine: hang the indoor unit
1. Put the bound pipes in the wall pipe and then make them pass through the wall
hole.
2. Hang the indoor unit on the wall-mounting frame.
3. Stuff the gap between pipes and wall hole with sealing gum.
4. Fix the wall pipe.
5.Check if the indoor unit is installed firmly and closed to the wall.
indoor
wall pipe
indoor and
outdoor power cord
liquid pipe
band
drain hose
outdoor
sealing gum
connection pipe
indoor power cord
3. Bind them evenly.
4. The liquid pipe and gas pipe should
be bound separately at the end.
at the bottom.
lower hook of
wall-mounting frame
-30-
drain hose
band
upper hook

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

38grq

Table of Contents