Unpacking; Installation; List Of Items Supplied; Battery Operation - KERN EMB 100-3 Operating Instructions Manual

School balance
Hide thumbs Also See for EMB 100-3:
Table of Contents

Advertisement

5.2

Unpacking

Carefully remove the balance from its packaging, remove the plastic wrapping and
position the balance in its intended working location.

5.2.1 Installation

Install the balance in such a fashion that the weighing plate is absolutely horizonta

5.2.2 List of items supplied

Standard accessories:
KERN EMB
• Balance
• Operating manual
• Batteries (2 x 1,5 V) or 1 x 9 V
5.3

Battery Operation

Remove the battery cover from the bottom of the balance. Connect 2 x 1,5V or 1 x 9V
batteries (EMB 200-2/EMB600-2 Block-Battery 9 V). Re-insert the battery cover.
Battery conservation through automatic power-off 3 minutes after ending a weighing
operation.
When the battery power is used up the display will show "LO". Press the
change the batteries at once.
When the balance is not in use for a longer period of time remove batteries and keep
them separately. Leakage of battery liquid might damage the balance.
5.4

Mains supply

Electric power supply is by means of the external mains supply circuit. The printed
voltage level must comply with the local voltage.
Only use original KERN mains supply circuits. The use of other makes is subject to
approval by Kern.
5.5

Initial start-up

A warm-up time of 3 minutes stabilises the measured values after switching on.
The accuracy of the balance depends on the local acceleration of the fall.
Please be sure to observe the information in the chapter on adjusting.
EMB-BA-e-1132
key and
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Emb

Table of Contents