Download Print this page

Wiring Of The Indoor Unit; Procedures Of Wiring - Hitachi RAI-25NH4 Installation Manual

Indoor unit split-unit air conditioner
Hide thumbs Also See for RAI-25NH4:

Advertisement

1
Preparation of Pipe
Use a pipe cutter to cut the copper pipe.
G
Trimming tool
Copper pipe
!
CAUTION
G
Jagged edge will cause leakage.
G
Point the side to be trimmed downwards during trimming to
prevent copper chips from entering the pipe.
G
Before flaring, please insert the flare nut into the pipe.
Die
Die
Copper pipe
A (mm)
Outer
Diameter (mm)
For R410A tool
For R22 tool
6.35 (1/4")
0 ~ 0.5
1.0
0 ~ 0.5
1.0
9.52 (3/8")
12.7 (1/2")
0 ~ 0.5
1.0
G
THIS APPLIANCE MUST BE EARTHED.
!
WARNING
Power supply shall be connected at the rated voltage, otherwise the unit will be broken or could not
reach the specified capacity.

Procedures of Wiring

50 mm
10mm
GRN + YEL
Indoor
45 mm
Unit
WARNING
!
G
The naked part of the wire core should be 10 mm and fix it to the terminal tightly. Then try
to pull the individual wire to check if the contact is tight. Improper insertion may burn the
terminal.
G
Be sure to use only power cables approved from the authorities in your country. For example
2
in Germany: Cable type: NYM 3x1.5mm
.
G
Please refer to the installation manual for wire connection to the terminals of the units. The
cabling must meet the standards of electrical installation.
There is a AC voltage of 240V between the L and N terminals. Therefore, before servicing,
G
be sure to remove the plug from the AC outlet or switch off the main switch.
Insulation And Maintenance Of Pipe Connection
1
The connected terminals should be completed sealed with
G
heat insulator and then tied up with rubber strap.
G
Please tie the pipe and power line together with vinyl tape as
shown in the figure showing the installation of Indoor and
Outdoor units. Then fix their position with holders.
To enchance the heat insulation and to prevent water
G
condensation, please cover the outdoor part of the drain hose
and pipe with insulation pipe.
G
If room humidity is high, cover the connecting pipe with
additional 5mm thickness insulator. This insulator shall be
purchased from field.
G
Completely seal any gap with putty.
Insulation material for pipe connection
Sleeve of
protection pipe
Putty
<
>
I000: A
2
Pipe Connection
G
Please be careful when bending the copper pipe.
G
Applied frozen grease to the connection points and then screw in
manually. After that, use a torque wrench to tighten the connection.
Wrench
Outer
dia.of pipe
6.35 (1/4")
Small dia. side
Large dia. side
9.52 (3/8")
12.7 (1/2")
A
Valve
Small dia. side
6.35 (1/4")
head cap
Large dia. side
9.52 (3/8")
12.7 (1/2")
Valve core cap
C, D
Strip Wires
2
Installation Of Remote Control
The remote controller can be placed in its holder which is
G
fixed on wall or beam.
G
To operate the remote controller at its holder, please ensure
that the unit can receive signal transmitted from the controller
at the place where the holder is to be fixed. The unit will beep
when signal is received from the remote controller. The signal
transmission is weaken by the florescent light. Therefore, during
the installation of the remote control holder, please switch on
the light, even during day time, to determine the mounting
location of the holder.
The controller must be hooked onto the hook at the lower
part of the holder. Push in the remote controller in the direction
as shown in figure below.
Screw (2 pieces)
Holder for
Remote Controller
Remote
Controller
3
Removal Of Air From The Pipe And Gas Leakage Inspection
Procedures of using Vacuum Pump for Air Removal
As shown in figure on the right, remove the cap of valve head
Flare nut
1
and valve core and then connect them to the vacuum pump
and manifold valve.
Fully tighten the "Hi" shuttle of the manifold valve and completely
Torque
unscrew the "Lo" shuttle. Run the vacuum pump for about 10–
wrench
2
15 minutes, then completely tighten the "Lo" shuttle and switch
off the vacuum pump.
Torque N·m
(kgf · cm)
Completely unscrew the spindle of the service valve (at 2 places)
3
in anti-clockwise direction to allow the flow of coolant (using
13.7 – 18.6 (140 – 190)
Hexagonal Wrench key).
34.3 – 44.1 (350 – 450)
44.1 – 53.9 (450 – 550)
19.6 – 24.5 (200 ~ 250)
Remove the Charge hose and tighten the cap of valve head.
4
19.6 – 24.5 (200 ~ 250)
The task is then completed.
29.4 – 34.3 (300 – 350)
12.3 – 15.7 (125 ~ 160)
Gas Leakage Inspection
Please use gas leakage detector to
check if leakage occurs at the
connection of Flare nut as shown on
the right.
If gas leakage occurs, further tighten
the connection to stop leakage. (Use
the detector provided for R410A)
CAUTION
!

Wiring Of The Indoor Unit

(1) Remove the cover of the electric box.
(2) Connect the connecting cords.
(3) Assemble the cover of electric box.
Insert and fix the
connecting cords
with screw
Checking for the electric source and the voltage range
Before installation, the power source must be checked and necessary wiring work must be completed. To make the wiring capacity proper, use the wire
G
gauge list below for the wiring from a switch board of fuse box to the outdoor unit in consideration of the locked rotor current.
IMPORTANT
Cable length
Wire cross-section
2
up to 16m
1.5mm
up to 15m
2.5mm
2
up to 25m
4.0mm
2
3
Power Source And Operation Test
Power Source
CAUTION
!
Please make sure, that the power voltage is 220V-230V
G
within the operation voltage of the unit.
G
Please take under consideration, that the power capacity
from your house distribution box is high enough for operating
your room air conditioner.
Operation Test
G
Please ensure that the air conditioner is in normal operating
condition during the operation test.
Explain to your customer the proper operation procedures
G
as described in the user's manual.
In case of removing Flare nut of a indoor unit, first remove a nut of small diameter side, or a seal
cap of big diameter side will fly out.
Connect the earth cord
C
RED : D
BROWN : C
IMPORTANT
Fuse Capacity
16A time delay fuse
4
Installation Of Optional Panel
G
Carefully read through the procedures of proper installation
before starting installation work.
When the meter reaches —101KPa (—76cmHg
during pumping, fully tighten the shuttle.
Meter showing pressure
Knob HI
Lo
Hi
R410A
Manifold valve
Vacuum pump
Charge
hose
When pumping starts, slightly loosen
the flare nut to check of air sucked in.
Then tighten the flare nut.
The body of
service valve
Cap of
valve core
Hexagonal
Wrench Key
Cap of valve head
Cap of valve head
After remove the band,
put the connecting
cords and fix with screw

Advertisement

loading

This manual is also suitable for:

Rai-40nh4