Shipping Inspection; Handling; Storage; Positioning The Water Heater - STIEBEL ELTRON Accelera 300 Operating And Installation

Dhw heat pump water heater
Table of Contents

Advertisement

INSTALLATION
INSTALLATION

10.2 Shipping inspection

» Upon receipt, check your delivery for completeness and
possible transport damage.
If transport damage is visible, proceed as follows:
- Do not accept the delivery or only with reservations.
- Note down the extent of the damage on the shipping
documents or on the delivery note of the carrier.
- Initiate a complaint.
Immediately give notice of any damage.
Give notice of all damage as soon as it has been
identified. Claims can only be accepted within the
applicable claim period.

10.3 Handling

CAUTION Injury through heavy loads
Dry, this water heater weighs 130 kg (290 lb.). Use
suitable aids and sufficient personnel when handling
this water heater.
Risk of damage through incorrect handling.
Incorrect handling can result in substantial material
losses.
Observe the information on the packaging.
Remove the packaging just before the installation.
Risk of damage through overturning.
The water heater has a high centre of gravity and a
low overturning moment. Protect the water heater
against overturning.
Only position the water heater on a level substrate.
To protect the water heater against damage, it should be
transported vertically inside its packaging. Where space is
restricted, you can also tilt (max. 45°) the water heater briefly
to move it.

10.4 Storage

Where it is necessary to store the water heater prior to installation
for a longer period, observe the following:
- If possible, store the water heater in a dry and dust-free
ambience.
- Prevent the water heater from coming into contact with
aggressive materials.
- Prevent the water heater from being exposed to shocks or
vibrations.
- In case of prolonged storage, check the condition of the
water heater and its packaging regularly.

10.5 Positioning the water heater

» Position the water heater with its wooden pallet at the final
installation location in a 10' x 10' x 8' area.
Install the water heater so that there is an adequate clearance
adjacent to the air grilles (see the following diagrams).
10.5.1 Installation conditions
It is important for water heater performance and to avoid damage
to adjacent surfaces that adequate clearance remains available
on the air flow intake (min. 2') and air flow exhaust sides (min
6') of the unit.
WWW.STIEBEL-ELTRON-USA.COM
It is important for water heater maintenance that adequate space
remains available above the water heater.
15
Air flow
intake
8
Air flow
intake
Air flow
intake
» Level the water heater horizontally by adjusting the feet.

10.6 Unpacking the water heater

Ensure that the casing material in the lower section
will not be damaged.
Advice - The longer you keep the packaging foil
wrapped around the water heater, the longer it will
be protected against damage.
» Remove the packaging straps.
ACCELERA® 300 HEAT PUMP WATER HEATER |
Air flow
exhaust
´
2
´
´ x 8´
´
Air flow
exhaust
Air flow
exhaust
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Accelera 300

Table of Contents