Locate and nark lag bolt locations and bottom mounting bracket location, if desired. See Figure
Book top rain flashing under back bend of top. Top rain flashing is shipped attached to the back of the
unit on the right side.
Position unit in opening and secure with
bolts.
Secure rain flashing to wall and caulk across entire length of top. See Figure 7.
For additional munting rigidity, the return air and supply air frames or collars can be drilled and
screwed or welded to the structural wall itself (depending upon wall construction). Be sure to observe
required clearance if combustible wall.
On
side
side installations, maintain a minimum of
by
control panel and heat strips and allow proper airflow to the outdoor coil. Additional clearance
required to meet local or national codes.
TOP OUTLET ONLY
Coat angles with
Figure
Secure angles to the top of the unit with
not relocate. See Figure
After installation of ductwork, seal around airframe and ductwork to provide a rain tlght seal.
It is strongly recommended, but not required, that this unit be installed under a soffit area Iarqe
enough to shield the top of the unit. See Figure 2C.
5/16
lag bolts: use
beads of silicone as shown. Silicone
screws provided. Use of prepunched holes provided.
inch diameter flat washers on the lag
20
inches clearance on right side to allow access to
shipped in the control panel, See