ELECTRIC
BEAT
Side section view of supply air duct for wall naunted unit showing
clearance to conbustible surfaces.
WARNING
clearance must
A
be
This is required for the first 3 feet of ducting.
It is important to insure that the
Failure to do this could result in overheating the mnbuntible material and nay result in a fire.
Need help?
Do you have a question about the CELHP and is the answer not in the manual?