1.
Fix the 7 screws with there bricks support to there designated space but do not
tightened tem completely. There should be 3 screw on the back and 2 on each side
of the stove. (See Fig. 1). If it's not already done.
2.
Install the bricks on the back and on the sides of the stove; A(10), C(1), E(2) then
completely tighten the bricks support screw so that the bricks be maintained at
there place (See Fig.1) If it's not already done.
3.
Install these bricks in the bottom of the stoves: A(6), B(1), D(1) (See Fig. 1) If
it's not already done.
4.
Install the 4 stainless steel pipes beginning from the rear of the stove. Put the
bricks retaining plate on the pipes. Install the 2 rear bricks on the top of the pipes
A(2) (See Fig. 1) If it's not already done.
5.
Install the Rockwool and the Rockwool protection plate on the bricks installed at
step 4. Verify that there is still space between the Rockwool and the deflector.
(See Fig. 2)
6.
Install the 4 remaining bricks A (4) on the pipes and install the last pipes.