Operation; Semi-Trash Pump Location; Connecting A Hose Kit - Champion 64022 Owner's Manual And Operating Instructions

2 inch semi trash pump
Table of Contents

Advertisement

Operation

Semi-Trash Pump Location

Place the semi-trash pump in a well-
ventilated area. DO NOT place the semi-
trash pump near vents or intakes where
exhaust fumes could be drawn into occupied
or confined spaces. Carefully consider wind
and air currents when positioning semi-
trash pump.
This semi-trash pump must have at least five
feet of clearance from combustible material.
Leave at least three feet of clearance on all
sides of the semi-trash pump to allow for
adequate cooling, maintenance and
servicing.
Place the pump on a level surface free from
any obstructions or potential hazards. The
pump should be placed close to the water
level to ensure maximum pump
performance.
Pump output will be affected by the type,
length, and size of the suction and discharge
hoses. The pumping height, also known as
the total head, is the distance from the water
level to the point of discharge. As this
distance increases, pump output decreases.
The discharge capacity is greater than the
suction capacity. Therefore, it is important
that the suction head is less than the
discharge head.
The time required to draw water from the
source to the pump (self-priming time) can
be decreased by minimizing the suction
head.
Rev 64022-20100514 E

Connecting a Hose Kit

NOTE
Both the intake and discharge ports are 2 in.
NPT. Please insure the connectors to the suction
and discharge hose are 2 in. NPT threaded.
Attach and thread the connector to the
threaded flange (Figure 1).
Figure 1
Slide the flexible, outlet hose over connector
and secure with the hose clamp (Figure 2).
Figure 2
Operation
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents