Installation Checklist - Trane AquaStream CGWN 205 Installation Operation & Maintenance

Indoor liquid chiller with integrated hydraulic module
Hide thumbs Also See for AquaStream CGWN 205:
Table of Contents

Advertisement

Installation checklist

This list must be checked off by the installer to ensure correct installation before the unit start up.
UNIT POSITION
Check clearance around condenser
Check clearance required for maintenance access
Check type and position of rubbers pads
Check unit is level
CHILLED WATER CIRCUIT
Check thermometers and manometers presence and position
Check water flow rate balancing valve presence and position
Check presence of strainer ahead of evaporator
Check presence of air-purge valve
Check rinsing and filling of chilled water pipes
Check water pump(s) contactor interconnected to control panel
Check water flow
Check chilled water pressure drop or unit available pressure (units with hydraulic module)
Check for leaks in chilled water pipes
ELECTRICAL EQUIPMENT
Check installation and rating of mains power switch/fuses
Check electrical connections complied with specification
Check that electrical connections are in accordance with information on manufacturer's identification plate
Check direction of rotation using phasemeter
Comments
.....................................................................................................................................................................
.....................................................................................................................................................................
.....................................................................................................................................................................
.....................................................................................................................................................................
.....................................................................................................................................................................
Signature:...............................................................................Name:...............................................................
Order N°: ......................................................................................................................................................
Work site: ......................................................................................................................................................
Please return to your local Trane Service Office
CG-SVX06D-E4
Operation
53

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aquastream cgwn 206Aquastream cgwn 210Aquastream cgwn 211Aquastream cgwn 212Aquastream cgwn 213Aquastream cgwn 214 ... Show all

Table of Contents