General Start-up
Electrical power wiring:
Check all the electrical terminals
are tight
Set-up compressors overload
relays
Set-up fan-motors overload relays
Electrical control wiring:
Check all the electrical terminals
are tight
Check all the pressostats
Check and set-up the TRACER
CH530 control module
Test and start-up without the
electrical power
Condenser:
Check setting of the safety
pressure valve
Check the insulation of the motors
using a 500V DC megohmeter
which meets manufacturer's
specifications (minimum value 2
megohms)
Figure 29 - Compressor oil level at oil equalization line
1. Max. oil level
2. Min. oil level
Operating parameters statement
Switch on main power supply
switch
Start the water pump(s) and check
there is no cavitation
Start-up the unit following
procedure described in the
CGWN-CCUN User Manual. The
unit and the chilled water pumps
contactor must be connected
together.
After unit start up, leave in operation
for at least 15 minutes, to ensure
pressures are stabilized. Then check:
voltage
compressors currents
leaving and return chilled water
temperature
suction temperature and pressure
ambient air temperature
blowing air temperature
discharge pressure and
temperature
liquid refrigerant temperature and
pressure
1
2
1
2
CG-SVX06D-E4