Operation Verification Tests

Table 2-3 lists the requirements for operation verification, which is a subset of the performance tests.
1
Turn-On Checkout
2
Voltage Programming and Readback Accuracy
3
Current Programming and Readback Accuracy
Note: Record the results of Tests 2 and 3 in the appropriate Performance Test Record sheets

Performance Tests

Performance tests check all the specifications of the power supply. The tests are grouped into constant-voltage mode tests
(Table 2-4) and constant-current mode tests (Table 2-5).

Constant Voltage (CV) Tests

Test Setup

Connect your dc voltmeter leads to only +S and -S (see Figure 2-1), because the power supply regulates the voltage
between these points, not between the + and - output terminals .

Test Procedures

Perform the test procedures in Table 2-4. The CV tests are:
Voltage Programming and Readback Accuracy
CV Load Effect
CV Source Effect
CV Noise (PARD)
Transient Recovery Time
Note
The tests are independent and may be performed in any order.
14 Verification
Table 2-3. Operation Verification Tests
Test
Refer To
Power Supply Operating Manual
Table 2-4