13
. DRIVE TRAIN
INSTALLATION
Install the front drive case into the frame.
Install and tighten the two mounting
bolts/nuts to the specified torque.
Torque: 4 kgf-m (40 N-m, 29 lbf-ft)
Install the front propeller shaft.
Install and tighten the three new bolts to
specified torque.
Always install the bolts with the new
ones.
Torque: 4.5 kgf-m (45 N-m, 32.4 lbf-ft)
Connect all wire connectors and then install
a new rubber band.
13-13
MXU 500
Front Propeller Shaft