GENERAL INFORMATION

The serial plate is located directly behind the upper
front panel (right side). For easy access, remove the 2
screws securing the upper front panel and hinge the
lower front panel downwards. Gas type, burner
ratings and electrical requirements are stated on the
Plate.
1. Damage Check: Check carton or crate for possible
damage incurred in shipping. After carefully
uncrating, check for 'concealed' damage. Report any
damage immediately to your carrier.
2. All units are protected with fuses which are located
inside the service box. For easy access, hinge front
panel downwards.
3. The correct type of gas for which the unit was
manufactured is noted on the rating plate, and this
type of gas must be used.
4. A pressure tap is supplied with each unit and is
installed on the manifold. The gas pressure must
be checked when unit is installed, to ensure unit
gas pressure is the same as specified on the rating
plate. For access to the pressure tap, remove front
panel, turn power switch to the 'OFF' position as a
precaution and hinge front panel downwards. The
pressure tap is located behind the front shield. If
necessary, pressure adjustments can be made at the
pressure regulator which is installed on the
manifold. For easy access to the pressure
regulator, view along left side of unit from
underneath. Once pressure test is completed, turn
power switch and thermostat to the 'OFF' position.
Raise lower front panel back into position.
5. Have a qualified gas technician check the gas
pressure to make certain that existing gas facilities
(meter, piping, etc.) will deliver the BTU's of gas
required at the unit with no more than 1/2" water
column pressure drop. When checking pressure, be
certain that all the
equipment on the same gas line is turned to the
'ON' position.
6. Make certain that new piping, joints and
connections have been made in a clean manner
and have been purged, so that piping compound,
chips, etc.. will not clog valves and/ or controls.
Use pipe joint sealant that is approved for use
with liquefied petroleum gas.
7. WARNING: Always check gas connections for
leaks using soap solution or similar means. DO
NOT CHECK WITH AN OPEN FLAME.

INSTALLATION CLEARANCES

This unit must be installed in accordance with the
following clearances in order to provide proper
operation and servicing of the appliance. Also. it is
recommended that unit be installed with sufficient
clearances to provide for proper cleaning and
maintenance. Minimum clearances are 0" for the sides
and 6" (152mm) from back to adjacent combustible
walls. Zero clearance is required from non-
combustible surfaces. Certified for installa tion on
combustible floor.

INSTALLATION INSTRUCTIONS

1. Carefully remove unit from carton or crate. Remove
any packing material from unit.
2. A protective material has been applied to the
stainless steel panels.
NOTE: This material must be removed
immediately after installation, as heat will melt the
material and make it difficult to remove.
3. These units must be installed under an adequate
ventilation system. Refer to the sections titled
VENTILATION and AIR SUPPLY for further
instructions.
4. Comply with clearances stated on the specification
sheet. Ensure there is sufficient
-2-