Planet HPOE-2400G User Manual page 15

Ieee 802.3at 12 / 24-port gigabit power over ethernet managed injector hub
Hide thumbs Also See for HPOE-2400G:
Table of Contents

Advertisement

You must use the screws supplied with the mounting brackets. Damage caused to the parts by
using incorrect screws would invalidate the warranty.
Step3: Secure the brackets tightly.
Step4: Follow the same steps to attach the second bracket to the opposite side.
Step5: After the brackets are attached to the Injector, use suitable screws to securely attach the brackets to the rack, as
shown in
Figure 2-2-2.
Step6: Proceeds with the steps 4 and steps 5 of session 2.2.1 Desktop Installation to connect the network cabling and
supply power to your PoE Injector Hub.
Figure 2-2-1: Brackets attaching to the PoE Injector Hub
Figure 2-2-2: Mounting the PoE Injector Hub in a Rack
User's Manual of HPOE-1200G / HPOE2400G
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hpoe-1200g

Table of Contents