System Start-Up

DANGER
Electric shock hazard. Can cause injury or death.
Before attempting to perform any service or
maintenance, turn the electrical power to unit to OFF
at disconnect switch(es). Unit may have multiple
power supplies.
CAUTION
Use caution when removing access panels or other
unit components, especially while standing on a
ladder or other potentially unsteady base. Access
panels and unit components can be heavy and
serious injury may occur.
CAUTION
Do not operate without the filters and birdscreens
installed. They prevent the entry of foreign objects
such as leaves, birds, etc.
CAUTION
Do not run unit during construction phase. Damage to
internal components may result and void warranty.
WARNING
• Unit was factory tested. All blowers, fans,
and compressors are set-up to run correctly
when supplied power. If any one fan is running
backwards or the compressor is making loud
noises, immediately turn off the power. Switch two
leads on the incoming power to the disconnect.
This will ensure proper operation of the unit. Failure
to comply may damage the compressors and void
the warranty.
• Do not jumper any safety devices when operating
the unit. This may damage components within or
cause serious injury or death.
10
Energy Recovery Ventilator
Every installation requires a comprehensive start-up
to ensure proper operation of the unit. As part of that
process, the following checklist must be completed and
information recorded. Starting up the unit in accordance
with this checklist will not only ensure proper operation,
but will also provide valuable information to personnel
performing future maintenance. Should an issue arise
which requires factory assistance, this completed
document will allow unit experts to provide quicker
resolve. Qualified personnel should perform start-up to
ensure safe and proper practices are followed.

Unit Documentation Record

Unit Model No. ___________________________________
Unit Serial No. _____________________________________
Energy Wheel Date Code ___________________________
Start-Up Date _____________________________________
Start-Up Personnel Name __________________________
Start-Up Company _________________________________
Phone Number ____________________________________

Pre-Start-Up Checklist

Disconnect and lock-out all power switches.
Remove any foreign objects that are located in the
energy recovery unit.
Check all fasteners, set-screws, and locking collars
on the fans, bearings, drives, motor bases and
accessories for tightness.
Rotate the fan wheels and energy recovery wheels
by hand and ensure no parts are rubbing.
Check the fan belt drives for proper alignment and
tension.
Filters can load up with dirt during building
construction. Replace any dirty pleated filters and
clean the aluminum mesh filters in the intake hood.
Verify that non-motorized dampers open and close
properly.
Check the tightness of all factory wiring
connections.
Verify control wire gauge.
Verify diameter seal settings on the energy recovery
wheel.
SPECIAL TOOLS
• Volt meter
• Incline manometer or equivalent
• Tachometer
• Amperage meter
®