When the outdoor unit is installed above the indoor unit the
following can occur:
The condensated water on the stop valve can move to the
indoor unit. To avoid this, please cover the stop valve with
sealing material.
If the temperature is higher than 30°C and the humidity is higher
than RH 80%, then the thickness of the sealing materials should
be at least 20 mm in order to avoid condensation on the surface
of the sealing.
Be sure to insulate the liquid and gas-side field piping and the
refrigerant branch kit.
Any exposed piping may cause condensation or burns
if touched.
(The highest temperature that the gas-side piping can reach is
around 120°C, so be sure to use insulating material which is
very resistant.)
1
2
3
Cautions for flare connection
Please refer to the table for the dimensions for processing flares
and for the tightening torques. (Too much tightening will end up
in splitting of the flare.)
Piping
Flare nut
size
tightening torque
14.2~17.2 N•m
Ø6.4
(144~176 kgf•cm)
32.7~39.9 N•m
Ø9.5
(333~407 kgf•cm)
49.5~60.3 N•m
Ø12.7
(504~616 kgf•cm)
61.8~75.4 N•m
Ø15.9
(630~770 kgf•cm)
97.2~118.6 N•m
Ø19.1
(989.8~1208 kgf•cm)
If a torque wrench is not available, be aware that the tightening
torque may increase suddenly. Do not tighten nuts any further
than to the angle as listed.
Piping size
Further tightening angle
Ø6.4
Ø9.5
Ø12.7
Ø15.9
Ø19.1
RZQ71~125B8V3B + RZQ100~140B7W1B
Split System air conditioners
4PW21412-1A
4
1
Compressor
2
Terminal cover
4
3
Indoor and outdoor
field piping
4
Corking, etc.
5
5
Insulation material
5
6
Bolts
6
A
Be careful with pipe,
bolt and outer panel
connections
A
A dimensions for
processing flares
(mm)
Flare shape
8.7~9.1
90° ±2
12.8~13.2
A
16.2~16.6
19.3~19.7
23.6~24.0
Recommended arm
length of tool
150 mm
60°~90°
200 mm
250 mm
30°~60°
300 mm
20°~35°
450 mm
When connecting the flare nut, apply refrigerating machine oil to
the flare (inside and outside) and first screw the nut 3 or 4 turns
by hand.
Coat here with ether or ester oil.
After completing the installation, carry out a gas leak inspection
of the piping connections with nitrogen and such.
Cautions for necessity of a trap
Since there is fear of the oil held inside the riser piping flowing back into
the compressor when stopped and causing liquid compression
phenomenon, or cases of deterioration of oil return, it will be necessary
to provide a trap at an appropriate place in the riser gas piping.
Trap installation spacing.
A
Outdoor unit
B
Indoor unit
C
Gas piping
D
Liquid piping
E
Oiltrap
H
Install trap at each difference in height of 10 m.
A trap is not necessary when the outdoor unit is installed in a
higher position than the indoor unit.
Cautions for brazing
Be sure to carry out a nitrogen blow when brazing.
Brazing without carrying out nitrogen replacement or releasing
nitrogen into the piping will create large quantities of oxidised
film on the inside of the pipes, adversely affecting valves and
compressors in the refrigerating system and preventing normal
operation. When brazing pipes however, do not use oxidation
preventers. Residue of such preventers may result in choking of
pipes or malfunction of components.
When brazing while inserting nitrogen into the piping, nitrogen
must be set to 0.02 MPa with a pressure-reducing valve (=just
enough so that it can be felt on the skin).
1
R=0.4~0.8
1
Refrigerant piping
2
Part to be brazed
3
Taping
4
Hands valve
5
Pressure-reducing valve
6
Nitrogen
(See figure 6)
2
3
4
6
5
6
Installation manual
8

Advertisement

Table of Contents
loading

Table of Contents