Cleaning And Filling New Water Boiler; Care And Maintenance: Extended Shutdown - Slant/Fin EUTECTIC EC-13A Installation And Operating Instructions Manual

Oil-fired water boilers/no. 2 oil
Hide thumbs Also See for EUTECTIC EC-13A:
Table of Contents

Advertisement

EUTECTIC EC-10
F. Once burner and draft have been set up, then smoke, CO
and stack temperature should be checked and recorded. If
smoke is greater than trace, review the burner instructions
and replace the nozzle if necessary. Normal smoke to be
expected is zero to a trace.
G. Make sure that the observation port cover is closed and the
two screws are tightened.
CLEANING AND FILLING A NEW WATER BOILER
I. There are a number of commercial preparations available
from your distributor for cleaning and for corrosion
protection conditioning the internal (waterside) surfaces of
boilers. Follow the preparation manufacturer's instructions.
DANGER: Use caution when handling chemicals and
draining hot water from a boiler. Scalding water and/or
chemicals can cause permanent injury to the skin, eyes
and respiratory system.
II. Filling and venting the water boiler after cleaning
A.
Refill the system with fresh water.
B.
Bring water temperature to at least 82°C (180° F)
promptly.
C. Circulate water through entire system.
D.
Vent the system, including the radiation.
E.
The boiler is now ready to be put into service or on
standby.
F.
If brand name air-control devices are used, venting
instructions furnished with the devices should
be followed.
III. Safety check for control system
High limit control test: Set thermostat high enough for boiler
water temperature to reach high limit control setting. When
this temperature is reached, the high limit switch should
open, and the burner should shut off automatically. If the
high limit does not operate to shut off the burner, the high
limit or the wiring is faulty. Repair or replace immediately.
CARE AND MAINTENANCE
I. EXTENDED SHUTDOWN, CLEANING OR REMOVAL OF
BOILER FROM SERVICE.
DANGER: Use CAUTION when handling chemicals and
draining hot water from a boiler. Scalding water and/or
chemicals can cause permanent injury to the skin, eyes and
respiratory system.
A.
Shut down burner by disconnecting all electrical power
to the burner by turning OFF the BURNER
EMERGENCY SWITCH of this boiler. After shutting
down burner, while the boiler is still hot [82°C to 93°C
(180°F to 200°F)], drain water from the bottom of the
boiler until it runs clear.
VOLUME OF WATER IN STANDARD PIPE OR TUBE
Nominal
Pipe Size
mm
in.
10
3/8
13
1/2
16
5/8
19
3/4
25
1
32
1
1
/
4
38
1
1
/
2
51
2
64
2
1
/
2
76
3
Standard Steel Pipe
Schedule
Inside
No.
Diameter
mm
in.
40
16
0.622
40
21
0.824
40
27
1.049
40
35
1.380
40
41
1.610
40
53
2.067
40
63
2.469
40
78
3.068
B.
Provide corrosion protection conditioning to the boiler
2
water in the heating system. There are a number of
commercial heating system preparations available from
your distributor. Follow the preparation manufacturer's
instructions.
II CLEANING OF BOILER
1.
To clean the fireside boiler surfaces, first shut down
burner by disconnecting all electrical power to the
burner by turning OFF the OIL BURNER EMERGENCY
SWITCH of this boiler in order to perform the following
in (a) through (h) below.
a.
Remove the flue pipe from the boiler flue collar
clean thoroughly.
b.
Inspect the entire vent connector back to the
chimney and clean if necessary.
c.
Inspect the chimney for soot, debris and other
unsafe conditions of the chimney and take the
necessary action.
d.
Remove the boiler jacket front panel to open
burner door as follows:
1. Lift the window.
2. Unscrew the two front panel side attachment
screws.
3. Unclip the front panel from the clips and
notches near the top, and pull it towards you.
4. Remove the front panel from the notches in the
bottom of the side panels.
e.
The burner mounting door must be fully open to
clean the flue passages and the combustion
chamber. If the oil line is not flexible enough it
should be disconnected from the burner during
the cleaning process. The flexible electric conduit
connected from the junction box on the boiler to
the burner via a plastic connector must be
disconnected from the burner by grasping the
Volume per
linear unit.
Diameter
L/m
U.S.G/ft.
mm
11
0.195
0.0157
14
17
0.344
0.0277
20
0.557
0.0449
26
0.967
0.0779
32
1.315
0.106
38
2.159
0.174
50
3.090
0.249
63
4.765
0.384
75
Type L Copper Tube
Inside
Volume per
linear unit.
in.
L/m
U.S.G/ft.
0.430
0.093
0.0075
0.545
.0150
0.0121
0.666
0.225
0.0181
0.785
0.311
0.0251
1.025
0.532
0.0429
1.265
0.810
0.0653
1.505
1.147
0.0924
1.985
1.998
0.161
2.465
3.078
0.248
2.945
4.393
0.354
9

Advertisement

Table of Contents
loading

Table of Contents