8

VENT PIPING AND DRAFT REGULATOR

A. Vent pipes must be installed having the same diameter as the boiler
outlet. (See page 2)
B. Vent pipes and breeching must be pitched upward a minimum of 1/4"
per foot.
C. Connect vent pipe to the chimney using as few elbows as possible.
D. Horizontal vent connector into the chimney should not be inserted
beyond the inside wall of the chimney.
E. Install barometric draft regulator on horizontal breeching, near chim-
ney, with hinge horizontal and face vertical. See manufacturer's
instructions packed in carton with barometric draft regulator.
F. If two or more appliances are used on the same chimney, see
CHIMNEY, page 3.
G. Make up all joints with minimum air leaks, secure with sheet metal
screws.

OPERATING INSTRUCTIONS

PRECAUTIONS BEFORE STARTING OIL BURNER
Make a positive check of A through F before starting burner:
A. Boiler and system are full of water. All air is vented from system.
See below.
B. All wiring is completed. See pages 11-13.
C. Oil supply is connected to the burner; nozzle is installed correctly; oil
valve is open at tank.
D. Smokepipe is connected to chimney.
E. All combustible materials are cleared away.
F. Combustion air supply is provided. See page 3.
G. Burner settings are adjusted as per pages 14-18 and as shown on
boiler jacket.
H. Main cast-iron door on which burner is mounted is bolted shut and
fiberglass rope seal is making good contact.
WARNING: NEVER OPERATE any natural draft* boiler
(Intrepid boiler is a natural draft boiler) with zero draft or over-
fire pressure: early failure of the burner, nozzle and chamber is
inevitable if you do. Use a draft gauge, and make sure that
overfire draft* is .02", minimum, during all operating conditions.
* Draft is negative or suction pressure.
START-UP (COMBUSTION TEST INSTRUMENTS MUST BE USED)
A. Make sure the boiler is installed and wired properly and is full of
water.
B. Open the observation door (on the front, above the burner).
C. Start the oil burner (see burner instructions for bleeding air from oil,
etc.). IMMEDIATELY, set burner air bands to obtain a bright fire with-
out smoke or oil stain. Set the DRAFT REGULATOR to obtain .02"
overfire draft*. Take draft reading through slot in observation door.
D. Close the observation door. Allow the burner to fire for at least one
hour total firing time, to bake out the volatile binders in the combus-
tion chamber before taking final combustion readings.
E. By alternate adjustment of the barometric draft regulator, the burner
air regulation and head regulation devices (whichever apply), set for
a trace of smoke and as close to 13% CO
the air bands or shutter (whichever apply) an additional 1/8". This
should result in zero smoke with NO raw oil on the smoke paper and
a smooth light-off. DO NOT ATTEMPT TO SET FIRE BY EYE.
Flame retention burners may appear efficient and smoke free from
an inefficient 7% up to an overly high 14% CO
CO
can also result in poor ignition and raw (unburned) oil entering
2
the fire box. At very high CO
reason will cause incomplete combustion, with high smoke and dry
soot formation in the fire box.
F. If smoke reading is satisfactory, but CO
satisfactory level (12% or better) or overfire draft of 0.02" W.C. can
not be obtained, check for proper sealing between sections, between
burner mounting plate and front section, around burner blast tube
and around flue collector and collar. If seal is not satisfactory, reseal
with furnace putty or silicone with a temperature rating of at least
400° F. (All safety precautions indicated on material package must
be followed.)
as you can. Then open
2
. However, a very low
2
, any slight decrease in air flow for any
2
can not be increased to a
2
G. Once burner and draft have been set up, then smoke, CO
temperature should be checked and recorded. If smoke is greater than
trace, review the burner instructions; replace the nozzle if necessary.
Normal smoke to be expected at approximately 13% CO
a trace.
CLEANING AND FILLING A NEW WATER BOILER
I. There are a number of commercial preparations available from your
distributor for cleaning and for corrosion protection conditioning the
internal (waterside) surfaces of boilers. Follow the preparation manu-
facturer's instructions.
DANGER: Use CAUTION when handling chemicals and draining hot
water from a boiler. Scalding water and/or
chemicals can cause permanent injury to the skin, eyes
and respiratory system.
II. FILLING AND VENTING THE WATER BOILER
A. Refill the system with fresh water.
B. Bring water temperature to at least 180° F. promptly.
C. Circulate water through entire system.
D. Vent the system, including the radiation.
E. The boiler is now ready to be put into service or on standby.
F. If brand-name air-control devices are used, venting instructions
furnished with the devices should be followed.
III. SAFETY CHECK FOR CONTROL SYSTEM
High limit control test: Set thermostat high enough for boiler water
temperature to reach high limit control setting. When this tempera-
ture is reached, the high limit switch should open, and the burner
should shut off automatically. If the high limit does not operate to
shut off the burner, the high limit or the wiring is faulty. Repair or