Storage - Heat Controller HBH Series Installation, Operation & Maintenance Manual

Commercial horizontal packaged water source heat pump 6-10 tons hbh series;
Hide thumbs Also See for HBH Series:
Table of Contents

Advertisement

IOM Manual
General Information
Safety
Warnings, cautions and notices appear throughout this
manual. Read these items carefully before attempting any
installation, service or troubleshooting of the equipment.
DANGER: Indicates an immediate hazardous situation,
which if not avoided will result in death or serious injury.
DANGER labels on unit access panels must be observed.
WARNING: Indicates a potentially hazardous situation,
which if not avoided could result in death or serious injury.
CAUTION: Indicates a potentially hazardous situation or
an unsafe practice, which if not avoided could result in
minor or moderate injury or product or property damage.
NOTICE: Notification of installation, operation or
maintenance information, which is important, but which is
not hazard-related.
WARNING! �
WARNING!
!
WARNING! To avoid the release of refrigerant into the
atmosphere, the refrigerant circuit of this unit must be
serviced only by technicians who meet local, state, and
federal proficiency requirements.
CAUTION!
� CAUTION! �
!
CAUTION! To avoid equipment damage, DO NOT use
these units as a source of heating or cooling during the
construction process. The mechanical components and
filters will quickly become clogged with construction dirt and
debris, which may cause system damage.
HBH SERIES
WARNING! All refrigerant discharged from this unit must be
recovered WITHOUT EXCEPTION. Technicians must follow
industry accepted guidelines and all local, state, and federal
statutes for the recovery and disposal of refrigerants. If a
compressor is removed from this unit, refrigerant circuit oil will
remain in the compressor. To avoid leakage of compressor oil,
refrigerant lines of the compressor must be sealed after it is
removed.
Inspection - Upon receipt of the equipment, carefully check
the shipment against the bill of lading. Make sure all units
have been received. Inspect the packaging of each unit,
and inspect each unit for damage. Insure that the carrier
makes proper notation of any shortages or damage on all
copies of the freight bill and completes a common carrier
inspection report. Concealed damage not discovered
during unloading must be reported to the carrier within
15 days of receipt of shipment. If not filed within 15 days,
the freight company can deny the claim without recourse.
!
Note: It is the responsibility of the purchaser to file all
necessary claims with the carrier. Notify your equipment
supplier of all damage within fifteen (15) days of shipment.
Storage - Equipment should be stored in its original
packaging in a clean, dry area. Store units in an upright
position at all times.
!
Unit Protection - Cover units on the job site with either the
original packaging or an equivalent protective covering.
Cap the open ends of pipes stored on the job site. In areas
where painting, plastering, and/or spraying has not been
completed, all due precautions must be taken to avoid
physical damage to the units and contamination by foreign
material. Physical damage and contamination may prevent
proper start-up and may result in costly equipment clean-up.
Examine all pipes, fittings, and valves before installing
any of the system components. Remove any dirt or debris
found in or on these components.
3
Heat Controller, Inc.
WARNING!
� WARNING! �
!
!