Download Print this page

Toshiba e-STUDIO163 Service Handbook page 114

Hide thumbs Also See for e-STUDIO163:

Advertisement

[A] Installation of the high-voltage transformer jig
(1)
Open the bypass tray, ADU and transfer
cover.
(2)
Open the front cover and take off the toner
cartridge.
(3)
Disconnect 1 connector. Loosen 2 screws
and pull out the process unit.
Note:
Note:
Be careful not to let the connector and the
harness be caught when installing the pro-
cess unit after adjustment.
(4)
Install the high-voltage transformer jig and fix
it with 2 screws.
Note:
Note:
Be careful not to let the connector and the
harness be caught.
(5)
Fix the green cable of the high-voltage trans-
former jig to the frame of the equipment.
e-STUDIO163/166/203/206
ADJUSTMENT
High-voltage transformer jig
Green cable
© 2005 - 2008 TOSHIBA TEC CORPORATION All rights reserved
3 - 32
Process unit
Connector
Fig. 3-15
Fig. 3-16
Screw
Fig. 3-17

Hide quick links:

Advertisement

loading