Identifying Rack Server Shipping Carton Contents; Installing Hardware Options; Installing The Server Into The Rack - HP ProLiant DL580 Generation 3 User Manual

Hide thumbs Also See for ProLiant DL580 Generation 3:
Table of Contents

Advertisement

54
HP ProLiant DL580 Generation 3 Server User Guide

Identifying rack server shipping carton contents

Unpack the server shipping carton and locate the materials and documentation
necessary for installing the server. All the rack mounting hardware necessary for
installing the server into the rack is included with the rack or the server.
The contents of the server shipping carton include:
Server
Power cord
Hardware documentation, Documentation CD, and software products
Rack mounting hardware
In addition to the supplied items, you may need:
Hardware options
Operating system or application software
PDU

Installing hardware options

Install any hardware options before initializing the server. For options installation
information, refer to the option documentation. For server-specific information,
refer to "Hardware options installation (on page 57)."

Installing the server into the rack

Refer to the installation instructions that ship with the rack kit to install the server
into the rack.
CAUTION: Do not operate the server for long periods with the
access panel open or removed. Operating the server in this manner
results in improper airflow and improper cooling that can lead to thermal
damage.