Wolf CGG-1K-24 Installation And Operating Instructions Manual page 30

Gas fired wall mounted boiler
Table of Contents

Advertisement

26
24
22
20
1 8
1 6
1 4
1 2
1 0
8
6
4
2
0
0
1
2
30
28
26
24
22
20
1 8
1 6
1 4
1 2
1 0
8
6
4
2
0
0
1
If the actual values fall outside these limits,
NB
readjust the gas valve (see the respective
chapter), otherwise material losses at the
boiler and incorrect functions can result.
3 0
Conversion to other gas types
Output CGG-1K-24 natural gas
Details relate to 1013 mbar air pressure and 15 °C gas temperature
3
4
5
6
Output CGG-1K-28 natural gas
Details relate to 1013 mbar air pressure and 15 °C gas temperature
2
3
4
7
8
9
Nozzle pressure [mbar]
5
6
7
Nozzle pressure [mbar]
Otherwise remove the test equipment:
- Shut down the boiler. Close the gas shut-off valve.
- Pull the hoses off and tighten test nipple
Open the gas shut-off valve.
Check the test nipple for soundness.
1 0
1 1
1 2
1 3
8
9
1 0
1 4
1 5
1 6
1 1
1 2
and test port
.
3062087_0207

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgg-1k-28

Table of Contents