Installation And Operation - Quality Espresso Q10 Instruction Manual

Hide thumbs Also See for Q10:
Table of Contents

Advertisement

3.

Installation and operation

 Once unpackaged, place the machine in the chosen place, for which a plug socket with an efficient grounding will be
required. Connect the network cable, place coffee in the hopper, open the closing sector and press the general switch
located under the grounds tray. The grinder will now be ready to operate.
a.
Fill with coffee beans
First use
4.
 To request the coffee dose, simply insert the filter holder until the end of the guide corresponding to the desired
dosage (right-hand guide for single dose and left-hand guide for double dose). When using the grinder for the first
time or whenever it has been completely emptied of coffee, press the dosage lever three times so the dispenser is
filled appropriately, and obtain the correct dosage.
5.
Adjusting the grinding point
Finer point
Note
: grinding point
i
To appreciate a significant change in the grinding point, you must at least fully turn the knob once.
-
Never turn the knob to finer (clockwise) more than one full turn without grinding, given that this could
-
cause a blockage of ground coffee.
b.
Open closing sector
!
Warning:
Do not pour ground coffee into the coffee bean hopper.
-
- If the grinder is used continuously, allow to rest every
30 minutes to avoid is from overheating.
Coarser point
20
c.
Press switch

Advertisement

Table of Contents
loading

Table of Contents