Soleus Air HCB-R135-A-ID Installation And Operating Instructions Manual page 7

13500 btu rv air conditioner
Table of Contents

Advertisement

7. Use the provided power supply in
Electric Box located on the side of the
Ceiling Assembly Frame for electrical
wiring (see P8 Figure 1,2).
Ceiling
Assembly
Roof Top
8. Connect Ceiling Assembly and Roof Top connectors (see P9
Figure 3,4).
9. Re-screw the Ceiling Grille to the Ceiling Assembly Frame.
6. Fasten each side of the Fabric Air Duct by secur-
ing the Air Vent Plate to the Ceiling Assembly
Frame with 4 Tapping Screws. Trim any excess
fabric that may extend beyond edge of Air Vent
Plate.
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hcb-r135-a-odHcb-r135-a

Table of Contents