Operating The Appliance; Preparation - Worcester ZWB 7-25 HE combi Users Instructions And Customer Care Manual

Greenstar he combi condensing boiler greenstar he system condensing boiler
Hide thumbs Also See for ZWB 7-25 HE combi:
Table of Contents

Advertisement

Operating the Appliance

3
Operating the Appliance
3.1

Preparation

Turn on the gas cock (172).
B Press in the handle and turn it anti-clockwise as far as the stop
(when handle is in line with direction of flow, the cock is open).
Central heating system valves (170)
B Using a spanner, turn square nut until groove is in line with
direction of flow (see detail).
Groove at right angles to direction of flow = off.
Cold water inlet valve (173)
B Turn handle so that it is in line with direction of flow.
When handle is at right angles to direction of flow, the valve is
closed.
170
10
172
173
6 720 610 577-02.1O
6 720 610 577 GB (03.02)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zb 7-28 he systemZwb 7-30 he combi

Table of Contents