Environment; System Requirements - ABB Busch-Welcome Operating Instructions Manual

Abb busch-welcome ip gateway
Table of Contents

Advertisement

Operating Instructions
®
Busch-Welcome
Pos: 10.1 /#Neustruktur#/Modul-Struktur/Online-Dokumentation/Überschriften (--> Für alle Dokumente <--)/1. Ebene/U - Z/Umwelt @ 18\mod_1302614158967_15.docx @ 103383 @ 333333 @ 1
3

Environment

Pos: 10.2 /#Neustruktur#/Online-Dokumentation (+KNX)/Sicherheitshinweise und Hinweise (--> Für alle Dokumente <--)/Hinweise/Hinweis - Umwelt - Hinweis Elektrogeräte @ 18\mod_1302763973434_15.docx @ 103500 @ 3333333333333 @ 1
Consider the protection of the environment!
Used electric and electronic devices must not be disposed of with domestic waste.
The device contains valuable raw materials which can be recycled. Therefore, dispose of the
device at the appropriate collecting depot.
Pos: 10.3 /#Neustruktur#/Online-Dokumentation (+KNX)/Sicherheitshinweise und Hinweise (--> Für alle Dokumente <--)/Hinweise/Hinweis - Umwelt - Entsorgung Elektrogeräte @ 20\mod_1325760695972_15.docx @ 136583 @ 3333333333 @ 1
All packaging materials and devices bear the markings and test seals for proper disposal. Always dispose of the
packaging material and electric devices and their components via the authorized collecting depots and disposal
companies.
The products meet the legal requirements, in particular the laws governing electronic and electrical devices and
the REACH ordinance.
(EU Directive 2002/96/EC WEEE and 2002/95/EC RoHS)
(EU REACH ordinance and law for the implementation of the ordinance (EC) No.1907/2006)
Pos: 11 /#Neustruktur#/Online-Dokumentation (+KNX)/Überschriften (--> Für alle Dokumente <--)/1. Ebene/S - T/Systemvoraussetzungen @ 17\mod_1297674446398_15.docx @ 100396 @ 333333323333311311 @ 1
4

System requirements

Pos: 12 /#Neustruktur#/KNX-Produkthandbücher/Busch-IP_Project/IPP Guides/Installation/Systemvorraussetzungen - 83341 @ 35\mod_1363612133631_15.docx @ 288502 @ 311311 @ 1
Note
When choosing the installation site, please note that the IP gateway must be connected to the
router by a LAN cable.
The following system requirements are necessary for smooth operation of the IP gateway:
Components for the IP gateway
The following components are required to operate the IP gateway:
®
-
A Busch-Welcome
door communication system including at least one outdoor station and one system
controller
-
IP network (should connect mobile devices, must have a WLAN connection)
-
An outdoor station with camera must be integrated for video transmission
As tenants
As tenants, the following come into question for operation with the IP gateway:
-
The Busch-ComfortTouch
-
Mobile terminal devices with Google Android (from Android 4.0 and Cortex-A8 CPU) or Apple iOS (from iOS
5) operating system
Mobile app
If you want to use the Busch-Welcome
met:
-
DSL-6000 Internet connection or faster
-
Minimum 3G (UMTS) mobile Internet
-
Camera for fast configuration via QR code
-
DynDNS account
Note
To correctly route calls from the Internet, the IP gateway must have a static IP address. If not, a
DynDNS service can ensure that calls are correctly routed (see section ""Network configuration"
page").
Pos: 13 /#Neustruktur#/Online-Dokumentation (+KNX)/Steuermodule - Online-Dokumentation (--> Für alle Dokumente <--)/++++++++++++ Seitenumbruch ++++++++++++ @ 9\mod_1268898668093_0.docx @ 52149 @ 111111111133333333333 @ 1
Operating Instructions | 1473-1-8354
®
series 2.4 or higher
®
mobile app from the Internet, the following requirements must also be
Environment
— 6 —

Advertisement

Table of Contents
loading

This manual is also suitable for:

83341-500

Table of Contents