LG LP070CEM Service Manual page 38

Lg packaged terminal air conditioner/heat pump
Table of Contents

Advertisement

Note:
The proper subbase must be ordered to obtain the correct
electrical receptacle. (Figure 60)
8. After wiring is complete, mount covers A and F to the
subbase with provided screws. (Figure 57)
9. When installing optional accessories to the subbase, refer
to each installation instruction for that accessory.
Figure 55
Figure 57 - Part/Location Identification
Part/Location Identification
A
Left Front Cover
B
Right Front Cover
C
Front Cord Panel
D
Wall Sleeve Hole Location
E
Skirting Hole Location
F
Right Cover Assembly
Wall Sleeve
D
E
Cover
Wiring
A
B
Access
Subbase
Box Assy
2-13/16"
D
(71 mm)
F
E
C
Low Voltage
Compartment
Figure 58 - Dimensions
Wall Sleeve
(Outdoor Side)
Ground
Screw Location
(78 mm)
13-7/8" (352 mm)
Figure 59 - Wiring Diagram
Field Wiring
Line Voltage
NEMA 6-20R
Receptacle
NEMA 6-30R
Receptacle
230/208 VAC Field Schematic
Figure 60 - NEMA Plug Configurations
Voltage
Unit Plug
—38—
13 3/4"
2 3/4"
16"
16"
Wall Sleeve
2 3/4"
Inside Edge
2 5/8"
Left End View
Concentric
Knockouts In Bottom
Top View
Receptacle Provided
Inside subbase
Accessory
3-1/16"
20-5/16" (515.5 mm)
Concentric
Knockouts In Rear
2" (50 mm) Max.
Adjustment
Front View
NEMA 7-20R
Receptacle
Field Wiring
Line Voltage
NEMA 7-30R
Receptacle
265 VAC Field Schematic
Subbase Receptacle
Back of
Flange "A"

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents