Weider WESY1938.1 User Manual page 13

2980 x
Table of Contents

Advertisement

18. Route the Low Cable (53) under a 90mm Pulley
(48) and through the Upright (3). Attach the Pulley
inside the Upright with an M10 x 67mm Bolt (71),
two M10 Washers (57), two 12mm Spacers (52),
and an M10 Locknut (56).
19. Route the Low Cable (53) over a 90mm Pulley
(48). Attach the Pulley and two Half Guards (43)
to the Double U-bracket (63) with an M10 x
46mm Bolt (81) and an M10 Locknut (56). Make
sure that the Half Guards are on the outside
of the U-bracket as shown.
20. Route the Low Cable (53) under a 90mm Pulley
(48). Attach the Pulley and two Half Guards (43)
to the Base (1) with an M10 x 46mm Bolt (81)
and an M10 Locknut (56). Make sure that the
Half Guards are on the outside of the bracket
as shown.
18
56
52
57
48
53
19
56
43
20
56
43
53
13
3
52
71
57
63
43
53
81
48
48
81
43
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wesy1938.02980 x

Table of Contents