Trane RAUC-C20 Installation Operation & Maintenance page 111

Remote split system units air cooled condensing units and evp chillers
Table of Contents

Advertisement

Supplied) 31
Suction Line Interconnecting
Tubing 34
Suction Line Thermostat 57
Supply Fan Interlock 50
T
T7067 Thermostat Terminal
Identification 64
Temperature Control
Parameters 53
Temperature vs Resistance
Curve 81
Thermometers 42
Thermostat Checkout 63
Thermostat Wiring 63
Thermostatic Expansion
Valve 84
Thermostatic Expansion
Valve (TEV) 32
Two Manifolded
Compressors 26
Typical Coil Piping For Dual
Circuit Units 36
Typical Compressor Terminal
Block 95
Typical Neoprene Isolator Se-
lection & Location 24
Typical Placement of Split
System piping
Components 33
Typical Spring Isolator Selec-
tion & Location 26
Typical Unit Weights & Point
Loading Data 22
Typical Vacuum Pump
Hookup 70
U
Unit Clearances 7
Unit Component Layout and
'shipwith' Locations 6
Unit Description 6
Unit Nameplate 5
V
Variable Air Volume (VAV)
Units 31
Variable Air Volume
Control 56
VAV W7100A Discharge Air
Controller (7U11) 83
Verifying Proper Supply Fan
Rotation 89
SS-SVX09A-EN
W
W7100A Discharge Air
Controller 73
W7100G Chilled Water
Controller 77
W7100G Staging
Sequence 85
W973 Master Energy Control-
ler (MEC) 81
Water Pressure Gauges 42
Water Shutoff Valves 42
Water Temperature
Sensor 42
Z
Zone Thermostat (6U37)
"Voltage Output"
ramps 80
Index
111

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rauc-c40Rauc-c25Rauc-c50Rauc-c30Rauc-c60

Table of Contents