Tadiran Telecom AVL-200 Service Manual page 26

Split system and package units
Table of Contents

Advertisement

SKY
7.5 Wiring the Packaged Unit
7.6 Finishing the Job
• Hide the tubing wherever possible.
• Make sure that the drainage tube slopes downstream along its entire length.
• Insulate tubing connections with insulation materials.
• Fasten tubes to the outside wall.
• Seal the hole through which the cables and tubing are passing.
• Connect the air conditioner to the power source. Check all air conditioning operating
modes. Consult the user manual.
7.7 Check List
Follow this check list:
• Does the drainage work?
• Are there unusual noises or vibrations during operation?
• Is noise, drain water or air flow from the unit likely to disturb the neighbors?
• Are there any gas leakages?
MAIN SWITCH
POWER SUPPLY
-
26
-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents