11.3 Outdoor Unit

11.3.1
Install the Outdoor Unit
š
After selecting the best location, start installation according to Indoor/Outdoor Unit Installation Diagram.
1
Fix the unit on concrete or rigid frame firmly and horizontally by bolt nut (ø10 mm).
2
When installing at roof, please consider strong wind and earthquake.
Please fasten the installation stand firmly with bolt or nails.
A
11.3.2
Connect the Piping
11.3.2.1
Connecting the piping to indoor
Please make flare after inserting flare nut (locate at joint portion of tube assembly) onto the copper pipe. (In case of
using long piping)
Connect the piping
š
Align the center of piping and sufficiently tighten the flare nut with fingers.
š
Further tighten the flare nut with torque wrench in specified torque as stated in the table.
11.3.2.2
Connecting the piping to outdoor
Decide piping length and then cut by using pipe cutter. Remove burrs from cut edge.
Make flare after inserting the flare nut (locate at valve) onto the copper pipe.
Align center of piping to valves and then tighten with torque wrench to the specified torque as stated in the table.
Spanner
or Wrench
B
Torque
wrench
Model
C7***, C9***, C12***
C18***
C24***
Do not overtighten, overtightening may cause gas leakage.
Piping size
6.35 mm (1/4")
9.52 mm (3/8")
12.7 mm (1/2")
15.88 mm(5/8")
19.05 mm (3/4")
35
A
B
C
474 mm
87 mm 18.5 mm 261 mm
570 mm
105 mm 18.5 mm 320 mm
612.5 mm 131 mm
19 mm
CAUTION
Torque
[18 N•m (1.8 kgf.m)]
[42 N•m (4.3 kgf.m)]
[55 N•m (5.6 kgf.m)]
[65 N•m (6.6 kgf.m)]
[100 N•m (10.2 kgf.m)]
D
383 mm